Vladivostok. September 22. VOSTOK-MEDIA - The final stage is paving the bridge over vtoraya rechka. During last night builders laid three strips of the base layer, it took more than 200 tons of asphalt.
As the representative of the contractor, today, September 22, will be laid another layer of macadam, asphalt (SMA), consisting of crushed stone frame in which all the voids between the larger gravel filled with a mixture of bitumen with crushed sand and mineral powder.